3D DESIGN BY RENOBILD
Your home in the Murree hills, designed and built while you live abroad
A bylaw-ready hill house with a rentable lower suite, a film you can walk through, and proof of what goes inside every wall.
Murree Hill Villa: walk through it before it is built
A RENOBILD design for a typical 10 marla sloping plot in the Islamabad–Murree hill belt. 3D visualisation of a concept, made for overseas families who cannot visit the site every month.
You see what is inside the walls, not just the paint
Every scene of the film carries a small window showing the same view as grey structure or as an X-ray of the wiring, plumbing and steel, with the plan and the camera position. During construction you get the real version of this every Friday on WhatsApp: photos and a short video, and photos of every hidden pipe and wire before plaster.




A family home that can also earn
| Plot | 10 marla, 35 x 65 ft, sloping toward the valley |
| Levels | Lower ground (walk-out) 860 sq ft · Ground (road level) 1,160 sq ft · First 1,160 sq ft |
| Covered area | about 3,180 sq ft |
| Rooms | 3 bedrooms + guest room, 4 baths + powder, lounge, kitchen, dining, family sitting |
| Lock-off suite | lower ground with its own garden entrance, kitchenette and bath: for guests, elders, or to rent |
| Outdoor | 2-car porch, roof garden, lounge deck, master balcony, fire-pit terrace |
| Away from home | smart locks with keypad, CCTV on the phone, owner's locked store, solar + battery backup |
Bylaw-ready from the first drawing
Hill plots fail approval when the design ignores the rules. This one is drawn to them.
| RULE | BYLAW | THIS DESIGN |
|---|---|---|
| Storeys | Ground + 2 maximum | Lower ground + ground + first (G+2) |
| Height | 38 ft maximum (seismic zone) | Ridge 36 ft 9 in above the lowest ground |
| Parking | Required inside the plot | 2-car porch inside the plot |
| Rainwater | Harvesting for houses above 5 marla | 10,000 litre underground tank under the porch |
| Professionals | Qualified professionals at each stage | Architect, structural engineer and PEC-registered site engineer |
Structure for the hills: RCC frame on stepped footings, an RCC retaining wall into the slope, seismic detailing, a roof designed for snow load, and perimeter drains to keep water off the slope.
Inside the Murree Hill Villa








How your house gets built while you live overseas
Work out the budget first with our house construction cost calculator, or see the 5 marla, 10 marla and 1 kanal cost guides.
- 1 · WhatsApp
Send the plot details
City, society, plot size and a short phone video of the plot. A relative can record it for you.
- 2 · 2 days
We visit the plot
Plot, road, levels and neighbours measured; you get the video and measurements.
- 3 · video call
Concept
Two layouts with 3D views and a first budget, discussed on video.
- 4 · 2–3 weeks
Design set and BOQ
24 sheets, calculations, renders and a measured BOQ as PDF, before you sign anything.
- 5 · 8–10 months
Construction you can watch
A WhatsApp report every Friday and a monthly bill measured with you on video.
- 6 · handover
Keys and House File
As-built drawings and photos of every hidden pipe and wire, handed to you or the person you name.
Promises you can check
Every promise is a clause in your stamp-paper agreement, and each one leaves proof you can check yourself.
Measured price
The BOQ lists every item with its measurement. Rates are locked in the contract.
Pay for work done
At month end we measure the work with you, on site or on video, and bill only that work.
Proof of materials
Mill certificate for every steel lot, batch photos for cement, a lab cube test for every slab.
Report every Friday
Photos, a short video, what was done this week and what comes next, on WhatsApp.
We pay if we are late
0.1% of the contract price for every week of delay within our control, up to 3%.
Written guarantees
5-year maintenance with a free yearly check-up, 5 years on waterproofing, 15 years on structure.
No big advance. Pay for measured work.
- Only a 10% security at signing, adjusted in the last bill
- One bill a month, for work measured with you at BOQ rates
- Payment by bank transfer to the company account, with a numbered receipt, never cash to workers
- You keep 5% of every bill as retention until handover and the defect period
مری کی پہاڑیوں میں آپ کا گھر
رینوبلڈ کا مری ہل ولا: ڈھلوان والے 10 مرلہ پلاٹ کے لیے مری بائی لاز کے مطابق ڈیزائن، زیادہ سے زیادہ گراؤنڈ + 2 منزلیں اور 38 فٹ اونچائی۔ نیچے کا حصہ الگ دروازے اور کچن کے ساتھ، چاہیں تو کرائے پر دیں۔ ہر منظر میں دیواروں کے اندر کا ثبوت: گرے اسٹرکچر، بجلی اور پانی کی لائنیں۔ ہم پلاٹ نہیں بیچتے، صرف آپ کے پلاٹ پر ڈیزائن اور تعمیر کرتے ہیں، اور صرف وہاں جہاں اتھارٹی تعمیر کی اجازت دے اور سوسائٹی کا این او سی ہو۔
Read before you build
Straight answers
Can you build my house in Murree right now?Kya aap abhi Murree mein mera ghar bana sakte hain?
Design, structure and approval drawings can start now. Construction starts only where the local authority currently allows building and the society shows its NOC / layout approval, which we check on the authority's own list. Murree has had periods of construction restrictions, so we confirm the current position before any construction promise.
How much will a house like this cost in Murree?Murree mein aisa ghar kitne ka banega?
Hill sites cost more than the plains because of slope foundations, retaining walls, transport and snow loads, and every plot is different. We do not guess a hill rate: after a site survey we give a measured BOQ with every item and rate before you sign.
Can I rent out part of the house?Kya main ghar ka kuch hissa kiraye par de sakta hoon?
Yes. The lower ground is a lock-off suite with its own garden entrance, kitchenette and bath, so you can rent it or host guests while the rest of the house stays private. Smart locks with a keypad allow keyless check-in.
Do you sell plots or work with a particular society?Kya aap plot bechte hain ya kisi society ke saath hain?
No. RENOBILD never buys, sells or books plots and is not affiliated with any society. We design and build on the plot you own, in societies that can show their NOC / layout approval.
Is this a real house?Kya yeh asli ghar hai?
It is a RENOBILD design concept shown as a 3D visualisation. The plans, areas and bylaw checks are real; your own house is designed for your plot, slope and family.
How much advance do you take?Advance kitna dena hoga?
Only a 10% security at signing, adjusted in the last bill. After that you pay one bill a month for work measured with you at BOQ rates, by bank transfer to the company account, and you keep 5% of every bill as retention.
What guarantees do you give, in writing?Guarantee kitne saal ki hai?
A 5-year maintenance guarantee with a free check-up visit every year, 5 years on roof and bathroom waterproofing and 15 years on structure, written into the stamp-paper agreement. If you sell the house, the guarantees pass to the new owner.
Is RENOBILD a registered company?Kya RENOBILD registered company hai?
Yes. RENOBILD (SMC-Private) Limited is incorporated with the SECP (CUIN 0366509, 16 Nov 2026) and registered with FBR (NTN K673445). You can verify the company on the SECP website.
Send your plot size or 3–4 photos on WhatsApp
We reply with the next step and a visit time. Overseas clients by video call.