Before you sign a builder’s quote: the hidden costs to check

Why the cheapest per-square-foot quote is often not the cheapest house, and what to get in writing.

RENOBILD engineering team · Updated 23 November 2026

Two builders quote Rs 3,500 and Rs 4,200 per square foot for the same house. The cheaper one is not always cheaper. Most cost overruns in Pakistan come from what is not written in the quote. Check these points before you sign.

1. How is the area measured?

Ask whether the rate is on covered area, built-up area including walls, or something else, and whether the roof room, stair tower, porch and boundary wall are included. Get the area written for each floor.

2. Is there a BOQ with quantities?

A BOQ (bill of quantities) lists every item with its quantity and rate: so many cubic feet of concrete, so many tons of steel, so many bricks. Without quantities, a per-square-foot price is only a promise. With a BOQ, you can see exactly what you are paying for and check it on site.

3. Are brands and specs written?

“Good quality tiles” means nothing. Ask for size, grade and price range for tiles, sanitary ware, wires, pipes, windows, doors and kitchen. Two quotes can only be compared when the specs are the same.

4. The usual hidden costs

  • Approval fees and drawings for the authority
  • Soil test and structural design
  • Boundary wall, gate and ramp
  • Water tank, septic tank and sewer connection
  • Electricity, gas and water connection fees
  • Site water and electricity during construction
  • Curing water, scaffolding and shuttering
  • Debris removal and final cleaning
  • Price escalation clauses for cement and steel
  • Rates for extra work and changes

5. How do you pay?

Avoid large advances. A fair structure is a small security at signing, then payment for work that is measured with you, by bank transfer with a receipt. Keep a retention (for example 5%) until handover and the defect period.

6. What is guaranteed, and what if they are late?

Ask for written guarantees on structure, waterproofing and maintenance, and a delay penalty. A builder who is confident in his work will write these into the agreement.

Score any quote in two minutes

Our free 15-point quote check on the homepage scores a builder’s quote and shows what is missing. At RENOBILD every item above is written into the stamp-paper agreement: measured BOQ, monthly bills for measured work, 10% security, 5% retention, a weekly report, a delay penalty and guarantees of 5 years maintenance, 5 years waterproofing and 15 years structure.

ٹھیکیدار کا کوٹیشن: چھپے ہوئے خرچے

سستا ریٹ ہمیشہ سستا گھر نہیں ہوتا۔ دستخط سے پہلے پوچھیں کہ رقبہ کیسے ناپا جائے گا، کیا بی او کیو میں مقدار لکھی ہے، اور ٹائل، سینیٹری اور تاروں کی تفصیل کیا ہے۔ منظوری کی فیس، باؤنڈری وال، ٹینک، کنکشن کی فیس اور تعمیر کے دوران پانی بجلی جیسے خرچے اکثر کوٹیشن میں نہیں ہوتے۔ بڑا ایڈوانس نہ دیں اور گارنٹی اور تاخیر کا جرمانہ لکھوا لیں۔

Questions people ask

Why do construction costs go over budget?تعمیر کا خرچہ بجٹ سے کیوں بڑھ جاتا ہے؟

Mostly because of items not written in the quote: approvals, connections, boundary wall, tanks, changes and price escalation. A measured BOQ with specs prevents most of it.

Is a per square foot rate enough to compare builders?کیا صرف فی مربع فٹ ریٹ سے موازنہ کافی ہے؟

No. Check how the area is measured, what is included and the specifications. Two rates can only be compared when the BOQ and specs are the same.

How much advance should I pay a builder?ٹھیکیدار کو کتنا ایڈوانس دینا چاہیے؟

As little as possible. A fair structure is a small security at signing, then monthly payment for work measured with you, with a retention until handover.