How to choose a construction company in Pakistan
Five checks and five red flags before you hand a builder your plot and your savings.
Your builder decides whether the house is strong, on budget and on time. Here is how to check a construction company in Pakistan before you hand over your plot and your savings.
1. Check that the company is real
- Ask for the company’s SECP registration and verify it yourself on the SECP website.
- Ask for its FBR tax number (NTN).
- For larger works, ask whether the contractor holds a Pakistan Engineering Council (PEC) constructor licence.
- Make sure the agreement is signed by the company, not only by a person.
2. Check who designs and supervises
Ask who signs the architectural and structural drawings and who visits the site. Structural design should be done by a PEC-registered engineer, and someone qualified should check the steel before every slab pour.
3. See real work
Visit a running site and a finished house if you can. Look at the brickwork, plaster lines, curing, how materials are stored and how clean the site is. Talk to a past client.
4. Compare quotes the right way
Compare BOQs and specifications, not only the rate per square foot. Our quote checklist lists the hidden costs to look for.
5. Get it in writing
- A stamp-paper agreement with the drawings, BOQ and specs attached
- A payment schedule linked to measured work, paid by bank transfer
- A retention amount until handover
- Written guarantees and a delay penalty
- A rate list for extra work and changes
Red flags
- A very large advance before work starts
- Cash payments to workers with no receipts
- No drawings, no BOQ, “we will manage on site”
- A price far below everyone else with no explanation
- Refusing to put guarantees in writing
RENOBILD (SMC-Private) Limited is SECP-registered (CUIN 0366509, verify) and puts every item above in its agreement. Read how we work.
تعمیراتی کمپنی کیسے چنیں؟
معاہدہ کرنے سے پہلے کمپنی کی ایس ای سی پی رجسٹریشن خود چیک کریں، دیکھیں کہ نقشہ اور اسٹرکچر کون بناتا ہے اور سائٹ پر نگرانی کون کرتا ہے۔ چلتی ہوئی سائٹ دیکھیں اور پرانے کلائنٹ سے بات کریں۔ اسٹامپ پیپر پر معاہدہ، بی او کیو، بینک کے ذریعے ادائیگی اور تحریری گارنٹی لیں۔ بڑا ایڈوانس اور نقد ادائیگی خطرے کی علامت ہیں۔
Questions people ask
How can I verify a construction company in Pakistan?تعمیراتی کمپنی کی تصدیق کیسے کریں؟
Ask for its SECP registration number and verify it on the SECP website, check its FBR NTN, and for larger works ask about a PEC constructor licence.
What should a construction agreement include?تعمیر کے معاہدے میں کیا ہونا چاہیے؟
Drawings, BOQ and specifications attached, a payment schedule linked to measured work, retention, guarantees, a delay penalty and rates for extra work.
Is the cheapest builder a good choice?کیا سب سے سستا ٹھیکیدار اچھا ہے؟
Only if the BOQ and specifications match the others. A much lower price without explanation often means missing items or lower quality.
Send 3–4 photos or your plot size on WhatsApp
We reply with what it probably is and the next step. Across Pakistan; overseas clients by video call.