1 kanal house construction cost in 2026
What a modern 1 kanal family house with basement costs to build in 2026: total, rate per sq ft and the area on every floor, from our Margalla Modern design.
1 kanal house: total cost and rate per sq ft
Our Margalla Modern design: a 50 x 90 ft (1 kanal, 4,500 sq ft) plot with basement + 2 storeys + roof, about 7,714 sq ft covered, 5 bedrooms. Includes design, engineering, supervision, tests and guarantees. The basement adds shoring and waterproofing; authority fees are extra at actual.
| PACKAGE | TOTAL | PER SQ FT | WHAT CHANGES |
|---|---|---|---|
| Economy | Rs 6.48 crore | ≈ Rs 8,400 | Grey structure + standard local finishes |
| Standard | Rs 7.71 crore | ≈ Rs 10,000 | Imported-grade fittings, double glazing, lift shaft ready |
| Premium | Rs 10.41 crore | ≈ Rs 13,500 | Stone and teak facade, lift, smart home, solar + battery |
Where the area goes, floor by floor
Cost follows covered area. A 1 kanal house without a basement covers about 5,300 sq ft in this layout, which lowers the total accordingly. Build time is 14 to 16 months including the basement.
| FLOOR | AREA | ROOMS |
|---|---|---|
| Basement | 2,384 sq ft | Home theatre, gym, staff |
| Ground floor | 2,600 sq ft | Drawing, dining, lounge, kitchen, guest room |
| First floor | 2,209 sq ft | Master suite + 3 bedrooms, upper lounge |
| Roof | 521 sq ft | Lounge, terrace, 12 kWp solar |
For a measured, line-by-line cost see our 5 marla cost breakdown and today's material rates.
About 10 to 12 months, in six stages
- 1 · 2 days
Site visit
Plot, road, levels and neighbours measured; we listen to how your family lives.
- 2 · 3–5 days
Concept
Two layouts with 3D views and a first budget.
- 3 · 2–3 weeks
Design set
24 sheets, calculations, renders and a measured BOQ.
- 4 · 1–2 months
Approval
Authority file prepared and followed; soil test and utilities in parallel.
- 5 · 8–10 months
Construction
Grey structure, then finishing. Steel checked before every pour.
- 6 · handover
Keys
A House File with as-built drawings and photos of every hidden pipe and wire.
No big advance. Pay for measured work.
- Only a 10% security at signing, adjusted in the last bill
- One bill a month, for work measured with you at BOQ rates
- Payment by bank transfer to the company account, with a numbered receipt, never cash to workers
- You keep 5% of every bill as retention until handover and the defect period
Promises you can check
Every promise is a clause in your stamp-paper agreement, and each one leaves proof you can check yourself.
Measured price
The BOQ lists every item with its measurement. Rates are locked in the contract.
Pay for work done
At month end we measure the work with you, on site or on video, and bill only that work.
Proof of materials
Mill certificate for every steel lot, batch photos for cement, a lab cube test for every slab.
Report every Friday
Photos, a short video, what was done this week and what comes next, on WhatsApp.
We pay if we are late
0.1% of the contract price for every week of delay within our control, up to 3%.
Written guarantees
5-year maintenance with a free yearly check-up, 5 years on waterproofing, 15 years on structure.
Straight answers
How much does it cost to build a 1 kanal house in 2026?1 kanal ghar banane ka kharcha kitna hai?
For our Margalla Modern design (basement + 2 storeys + roof, about 7,714 sq ft, 5 bedrooms) the indicative cost is Rs 6.48 crore (Economy), Rs 7.71 crore (Standard) or Rs 10.41 crore (Premium), plus or minus 15% until the measured BOQ. Authority fees are extra.
What is the per sq ft rate for a 1 kanal house?1 kanal ghar ka per square foot rate kya hai?
About Rs 8,400 (Economy), Rs 10,000 (Standard) and Rs 13,500 (Premium) per sq ft of covered area in Islamabad in 2026, including design, engineering, supervision, tests and guarantees.
How long does a 1 kanal house take to build?1 kanal ghar kitne mahine mein banta hai?
About 14 to 16 months for this design including the basement, after design and approvals.
Does a basement add a lot to the cost?Basement se kharcha kitna barhta hai?
The basement is about 2,384 of the 7,714 sq ft in this design, and it also needs shoring and waterproofing. Without it the house covers about 5,300 sq ft, so the total drops roughly in proportion.
How much advance do you take?Advance kitna dena hoga?
Only a 10% security at signing, adjusted in the last bill. After that you pay one bill a month for work measured with you at BOQ rates, by bank transfer to the company account, and you keep 5% of every bill as retention.
What guarantees do you give, in writing?Guarantee kitne saal ki hai?
A 5-year maintenance guarantee with a free check-up visit every year, 5 years on roof and bathroom waterproofing and 15 years on structure, written into the stamp-paper agreement. If you sell the house, the guarantees pass to the new owner.
Is RENOBILD a registered company?Kya RENOBILD registered company hai?
Yes. RENOBILD (SMC-Private) Limited is incorporated with the SECP (CUIN 0366509, 16 Nov 2026) and registered with FBR (NTN K673445). You can verify the company on the SECP website.
Send your plot size or 3–4 photos on WhatsApp
We reply with the next step and a visit time. Overseas clients by video call.