RENOBILD Call +92 300 884 8555
Building back home from abroad? You see every stage3D DESIGN BY RENOBILD
Overseas Pakistanis

Building back home from abroad? You see every stage

Meetings by video call, a measured BOQ before you sign, monthly bills measured with you on video, and a WhatsApp report with photos every Friday.

RENOBILD (SMC-Private) Limited SECP CUIN 0366509 · verify FBR NTN K673445Mon–Sat 10–7
Build without flying back

You stay in control from abroad

Video-call meetings

Concept, design and every decision discussed on video at a time that suits your country.

Measured BOQ

You see every quantity and rate before you sign.

Bills on video

At month end we measure the work with you on video and bill only that work.

Friday report

Photos, a short video, what was done this week and what comes next.

Your own engineer

Send a relative or your own engineer to inspect the site any time.

House File

As-built drawings and photos of every hidden pipe and wire at handover.

Written into every RENOBILD agreement

Promises you can check

Every promise is a clause in your stamp-paper agreement, and each one leaves proof you can check yourself.

01

Measured price

The BOQ lists every item with its measurement. Rates are locked in the contract.

02

Pay for work done

At month end we measure the work with you, on site or on video, and bill only that work.

03

Proof of materials

Mill certificate for every steel lot, batch photos for cement, a lab cube test for every slab.

04

Report every Friday

Photos, a short video, what was done this week and what comes next, on WhatsApp.

05

We pay if we are late

0.1% of the contract price for every week of delay within our control, up to 3%.

06

Written guarantees

5-year maintenance with a free yearly check-up, 5 years on waterproofing, 15 years on structure.

How you pay

No big advance. Pay for measured work.

  • Only a 10% security at signing, adjusted in the last bill
  • One bill a month, for work measured with you at BOQ rates
  • Payment by bank transfer to the company account, with a numbered receipt, never cash to workers
  • You keep 5% of every bill as retention until handover and the defect period
Questions people ask

Straight answers

How much advance do you take?Advance kitna dena hoga?

Only a 10% security at signing, adjusted in the last bill. After that you pay one bill a month for work measured with you at BOQ rates, by bank transfer to the company account, and you keep 5% of every bill as retention.

What guarantees do you give, in writing?Guarantee kitne saal ki hai?

A 5-year maintenance guarantee with a free check-up visit every year, 5 years on roof and bathroom waterproofing and 15 years on structure, written into the stamp-paper agreement. If you sell the house, the guarantees pass to the new owner.

Is RENOBILD a registered company?Kya RENOBILD registered company hai?

Yes. RENOBILD (SMC-Private) Limited is incorporated with the SECP (CUIN 0366509, 16 Nov 2026) and registered with FBR (NTN K673445). You can verify the company on the SECP website.

Start here

Send your plot size or 3–4 photos on WhatsApp

We reply with the next step and a visit time. Overseas clients by video call.

More from RENOBILD
WhatsApp