3D DESIGN BY RENOBILD
Design and construction for Karachi homes
The same measured-price contract we use across Pakistan, priced at Karachi rates after a site visit: drawings, 3D, BOQ, construction paid month by month for work done, and a report every Friday.
Building material rates in Karachi
| ITEM | RANGE (RS) | UNIT |
|---|---|---|
| Cement 50 kg, city avg | 1,491 | per bag |
| Sariya Grade 60 | 260 – 265 | per kg |
| Sariya Grade 40 | 255 – 260 | per kg |
| Bricks 1st class | 17,000 – 21,000 | per 1,000 |
| Crush | 160 – 180 | per cft |
Cement: PBS city average, week to 19 Nov; change vs PBS 8 Oct · steel: national range · bricks and crush: dealer lists. Not government (DC) notified. Compare all 7 cities.
About 10 to 12 months, in six stages
- 1 · 2 days
Site visit
Plot, road, levels and neighbours measured; we listen to how your family lives.
- 2 · 3–5 days
Concept
Two layouts with 3D views and a first budget.
- 3 · 2–3 weeks
Design set
24 sheets, calculations, renders and a measured BOQ.
- 4 · 1–2 months
Approval
Authority file prepared and followed; soil test and utilities in parallel.
- 5 · 8–10 months
Construction
Grey structure, then finishing. Steel checked before every pour.
- 6 · handover
Keys
A House File with as-built drawings and photos of every hidden pipe and wire.
Promises you can check
Every promise is a clause in your stamp-paper agreement, and each one leaves proof you can check yourself.
Measured price
The BOQ lists every item with its measurement. Rates are locked in the contract.
Pay for work done
At month end we measure the work with you, on site or on video, and bill only that work.
Proof of materials
Mill certificate for every steel lot, batch photos for cement, a lab cube test for every slab.
Report every Friday
Photos, a short video, what was done this week and what comes next, on WhatsApp.
We pay if we are late
0.1% of the contract price for every week of delay within our control, up to 3%.
Written guarantees
5-year maintenance with a free yearly check-up, 5 years on waterproofing, 15 years on structure.
No big advance. Pay for measured work.
- Only a 10% security at signing, adjusted in the last bill
- One bill a month, for work measured with you at BOQ rates
- Payment by bank transfer to the company account, with a numbered receipt, never cash to workers
- You keep 5% of every bill as retention until handover and the defect period
Read before you build
Straight answers
Do you build houses in Karachi?Kya aap Karachi mein ghar banate hain?
Yes. RENOBILD (SMC-Private) Limited designs, builds and renovates homes in Karachi with the same contract we use everywhere: a site visit, a measured BOQ at Karachi market rates, one bill a month for work measured with you, a report every Friday and written guarantees (5-year maintenance, 5-year waterproofing, 15-year structure).
What is the cement rate in Karachi today?Karachi mein aaj cement ka rate kya hai?
When we checked on 25 Nov 2026, cement in Karachi averaged about Rs 1,491 per 50 kg bag. Rates move; always ask for a written quote.
What do bricks and crush cost in Karachi?Karachi mein eent aur bajri ka rate kya hai?
First-class bricks were about Rs 17,000 to 21,000 per 1,000 and crush about Rs 160 to 180 per cft in Karachi on 25 Nov 2026, from dealer lists.
How is the price fixed before work starts?Kaam se pehle qeemat kaise tay hoti hai?
We visit the plot, prepare drawings and a measured BOQ with every quantity written down, and price it at local rates. You approve the BOQ before work starts; after that the price changes only if you change the design, in writing, priced first.
How much advance do you take?Advance kitna dena hoga?
Only a 10% security at signing, adjusted in the last bill. After that you pay one bill a month for work measured with you at BOQ rates, by bank transfer to the company account, and you keep 5% of every bill as retention.
What guarantees do you give, in writing?Guarantee kitne saal ki hai?
A 5-year maintenance guarantee with a free check-up visit every year, 5 years on roof and bathroom waterproofing and 15 years on structure, written into the stamp-paper agreement. If you sell the house, the guarantees pass to the new owner.
Is RENOBILD a registered company?Kya RENOBILD registered company hai?
Yes. RENOBILD (SMC-Private) Limited is incorporated with the SECP (CUIN 0366509, 16 Nov 2026) and registered with FBR (NTN K673445). You can verify the company on the SECP website.
Send your plot size or 3–4 photos on WhatsApp
We reply with the next step and a visit time. Overseas clients by video call.